We are looking to purchase a mobile wastewater container plant, that can treat up to 100 to 400 cubic meter per day.
its output should be not more than bod3, to be used for irrigation, car washing, the unit to be on truck can move whenever needed and to get stplized in 2 to 3 days.
the unit will remain in each location for 3 to 4 months than move with the crew to other location, it will be in desert where temprture goes up to 50c. |